How to Add a Report to the 'Project Tasks' List on the Project Center page of Business Portal.


Action


On the Project Center page of Business Portal with Microsoft Dynamics SL, there is a box with the heading 'Project Tasks' with various screens listed. It is possible to change these screens to instead launch a report.

Result


The report ID will be added to the 'Project Tasks' list.

Resolution


To add the report information, please do the following:

If the terminal server access is set to "Use Internet Explorer to access the back office", then the link should look like this:

[stuff]/SLLaunch.aspx?Module=SY&Screen=ROI&Record=TM010

Replace the [stuff] with the same values from a working link such as "Invoice and Adjustment Maintenance" and TM010 can be replaced with another Project Report ID (does not need the last two zeros on the report ID).  
Example: "http://servername/businessportal/SLLaunch.aspx?Module=SY&Screen=ROI&Record=TM010"


If the terminal server access is set to "Use a Local Installation of the Back Office Application", then the link should look like this:

[stuff]/SLLaunch.aspx?Screen=ROI&Record=TM010

Replace the [stuff] with the same values from a working link such as "Invoice and Adjustment Maintenance". 
Example: "http://fohmasmus1/businessportal/SLLaunch.aspx?Screen=ROI&Record=TM010" The only difference is the Module parameter was left out.

More Information


As a disclaimer, the 'Project Tasks' list was designed to launch only screens. If the above steps are performed to add a report and it does not behave as the client would like, there is not much we can do in terms of making changes.