SPO: Tasks synced to Outlook through Exchange lose html formatting

Summary
If you add HTML formatting and hyperlinks to a task's Description field, you may lose that formatting when you enable Outlook Sync for your tasks within SharePoint Online, MySite, Task list.
More information
This is by design, because this also syncs Project tasks and because Microsoft Project Professional does not handle HTML. When linking to the Exchange Body property, the sync engine retrieves the text version of the task’ s description. This same behavior is used when synchronizing to your SharePoint, MySite, Tasks list. The Tasks list can hold both SharePoint tasks and Project tasks, therefore we default to using the behavior for Project Professional.
Outlook Sync Newsfeed Mysite
Note This is a "FAST PUBLISH" article created directly from within the Microsoft support organization. The information contained herein is provided as-is in response to emerging issues. As a result of the speed in making it available, the materials may include typographical errors and may be revised at any time without notice. See Terms of Use for other considerations.
Properties

Article ID: 2895493 - Last Review: 01/13/2016 16:15:00 - Revision: 2.0

Microsoft SharePoint Online, Microsoft Project Online

  • KB2895493
Feedback