How to track historical costs for standard cost items in Microsoft Dynamics GP

This article has been archived. It is offered "as is" and will no longer be updated.
INTRODUCTION
This article describes the Item Standard Cost Changes History Report feature that is included with Manufacturing in Microsoft Dynamics GP and in Microsoft Business Solutions - Great Plains. With this feature, you can view the history of cost changes for standard cost items.
More information
The Item Standard Cost Changes History Report describes the historical cost changes. To print this report, click Reports, point to Manufacturing, point to Item Engineering, and then click Item Standard Cost Changes History.

To change costs, use one of the following methods:
  • Click Tools, point to Routines, point to Manufacturing, click Roll Up and Revalue, and then change the costs.
  • Click Cards, point to Manufacturing, point to Inventory, click Standard Cost Changes, and then change the costs.
Every time that you change the costs, Microsoft Dynamics GP adds records to the IC_Cost_Tracked_Changes table (CT00200). Microsoft Dynamics GP uses this table to print the Item Standard Cost Changes History Report.
Properties

Article ID: 883471 - Last Review: 01/07/2015 08:44:00 - Revision: 5.0

  • Microsoft Dynamics GP 10.0
  • Microsoft Dynamics GP 9.0
  • Microsoft Business Solutions–Great Plains 8.0
  • Manufacturing
  • kbnosurvey kbarchive kbhowto kbmbsmigrate KB883471
Feedback