Applies To
Contract Management

Symptoms

Consider the following in Microsoft Dynamics SL:

You enter a subcontract change order for a foreign currency subcontract.

Without closing the screen, you enter a subcontract  change order for a base currency subcontract.

When you do this, the curyrate and change_amt are incorrect on the base currency subcontract change order.

 

 

 

 

 

 

Resolution

Hotfix information for Microsoft Dynamics SL

A supported hotfix is now available from Microsoft. However, this hotfix is intended to correct only the problem that is described in this article. Apply this hotfix only to systems that are experiencing this specific problem. This hotfix might receive additional testing. Therefore, if you are not severely affected by this problem, we recommend that you wait for the next Microsoft Dynamics SL Service Pack that contains this hotfix as specified in the "Status" section in this article.

To resolve this problem, click the link for the appropriate version to obtain the hotfix.

Microsoft Dynamics SL 2015 CU2

Note If additional issues occur or any troubleshooting is required, you might have to create a separate service request. The usual support costs will apply to additional support questions and issues that do not qualify for this specific hotfix. To create a separate service request, visit the following Microsoft Web site:

http://support.microsoft.com/contactus/?ws=support

File information

The English version of this hotfix has the file attributes (or later file attributes) that are listed in the following table. The dates and times for these files are listed in Coordinated Universal Time (UTC). When you view the file information, it is converted to local time. To find the difference between UTC and local time, use the Time Zone tab in the Date and Time item in Control Panel.

Microsoft Dynamics SL 2015 Cumulative Update 2 (CU2)

Changed Files

 Date

File Version

CNCOS00.exe

23-Aug-2017

9.02.50823.00

 

Installation information

Install this hotfix by following the installation instructions that are included in the hotfix download.

Prerequisites

For information about the prerequisites for this hotfix, refer to the installation instructions that are included in the hotfix download.

Restart requirement

If you are prompted, restart the computer after you install the hotfix.

Removal information

You cannot remove this hotfix.

Status

Microsoft has confirmed that this is a problem in the Microsoft products that are listed in the "Applies to" section.

This problem was reported as issue number 38589.

More Information

For more information about software update terminology, click the following article number to view the article in the Microsoft Knowledge Base:

824684 Description of the standard terminology that is used to describe Microsoft software updates

Need more help?

Want more options?

Explore subscription benefits, browse training courses, learn how to secure your device, and more.